Lands Building
Builder: Hansen Yunken
Terrazzo: DM Terrazzo
Tiles were mostly removed by other contractors, we prepped the floor, applied a primer and trims to the floors before installing DM Terrazzo floor.
This flooring project was broken into several stages. This building was still open and functioning so acess to the lifts needed to be maintained. This meant lots of night works in some areas. The Team and site managers worked so well together to make this installation as seemless as possible during the middle of a pandemic.
Control and expansion joints were special ordered from Latham Australia and installed prior to pouring. Due to this being a main throughfair a P3 non-slip finish was chosen which gives a matte to satin finish on the floor.
The beauty of this system is if any repairs or rectifcation works are needed the floor is able to be removed, replaced and blended back in to disappear. Case in point is a door threshold was miscalculated so we had to return months later to pour a new section. It seemlessly blends in.