ARB
Location: West Gosford
Completed: 2020
Client: Hunter Group Holdings
This was a complete knock down and redevelopment on this site. This project was several years in the making but in the end they delivered a wonderful building and showroom. ARB spefically chose the colours and layout and designed a stained pathway around the polished floor.
The warehouse and workshop received a cream polish to ensure the space maintained a dustproof surface and keep the space as clean as possible. This was an effective low cost option with the best long term results.
With regular cleaning and maintenance this floor should shine for generations.